Spare-parts inventory for manufacturing
Every spare part. Found in seconds.
PartsVault turns two photos into a complete parts record. When a machine goes down, your technician knows in seconds whether you have the part, which bin it is in and where to buy another.
Find the part. Find the bin. Keep the line running.
Other possible matches
Match: Deep groove ball bearing 6205-2RS
96% match
Location
Bin 12
Storeroom A, Rack 4
In stock
4 on hand
0 reserved
Last purchased
Mar 3, 2026
Grainger, $14.20
Where to buy another
Grainger, preferred supplier, lead time 2 days
Motion Industries, alternate supplier
Invoice 4471982 is attached to this part
Used on
Conveyor line 3, drive roller. One earlier failure logged.
Two photos. That is the whole idea.
One photo when you buy it. One when it breaks.
STEP 1 · INTAKE
Photograph a part when you buy it.
Snap the part, its label and the receipt. AI names the part, reads the part number and pulls supplier, price and date from the invoice. You confirm the bin and save.
STEP 2 · LOOKUP
Photograph it again when it breaks.
Hold up the failed part. PartsVault matches it to your inventory and answers the only questions that matter: do we have one, where is it, and how many are left.
Intake review
The record fills itself in.
Every field arrives pre-filled with a confidence badge. Anything the AI is unsure about is flagged amber, so a ten-second check replaces five minutes of typing.
New part · step 2 of 3: review
AI filled 6 fieldsPart name
Part number
Manufacturer
Machine
Supplier and invoice
Unit price and quantity
Suggested bin: Storeroom A, Rack 4, Bin 12
Other bearings are stored here
Other possible matches
Match: Deep groove ball bearing 6205-2RS
96% match
Location
Bin 12
Storeroom A, Rack 4
In stock
4 on hand
0 reserved
Last purchased
Mar 3, 2026
Grainger, $14.20
Where to buy another
Grainger, preferred supplier, lead time 2 days
Motion Industries, alternate supplier
Invoice 4471982 is attached to this part
Used on
Conveyor line 3, drive roller. One earlier failure logged.
Find Part
The answer comes first.
Location and quantity lead the card. Last purchase, suppliers and machines follow. Take 1 issues the part, updates stock and logs it against the machine.
Dashboard
Know what is about to run out.
Low stock, critical spares at risk and recent activity in one view. Green, amber and red mean one thing only: stock status.
Parts tracked
1,248
Low stock
17
Critical at risk
3
Stock value
$218,400
Low stock alerts
| Part | Bin | On hand / min |
|---|---|---|
| Hydraulic seal kit, Press 2 | B2-07 | 1 / 2 |
| V-belt B68 | A1-03 | 2 / 4 |
| Proximity sensor M12 | C3-11 | 0 / 2 |
| Contactor 24V | A4-09 | 1 / 3 |
Amber: below minimum. Red: none left.
Recent activity
Took 1 bearing 6205-2RS
Today
Received 6 bearings, Grainger
Today
Failure logged, Press 2 seal
Yesterday
Cycle count, Rack 4: no variance
Yesterday
Why plants use it
Built for parts that sit on a shelf for ten years.
-
Minutes back on every breakdown
A photo of the broken part returns the bin and the count. No walking the aisles, no calling the one person who knows.
-
The receipt never goes missing
Every part stays linked to its original invoice, so price, supplier and warranty are there ten years later.
-
No tribal knowledge
A new hire on night shift finds the same part as the storeroom veteran, in the same number of taps.
-
A location for everything
Building, room, rack, shelf, bin. Each one has a QR label, and each part knows where it lives.
-
Reorder before you run out
Set a minimum per part. When stock drops below it, the right people hear about it.
-
Every change on record
Who took it, when, for which machine. Every stock movement is logged with user and time.
How it works
Four steps, start to shelf to line.
-
01
Photograph
Part, label close-up, receipt. Phone or tablet, right at the receiving bench.
-
02
Review
AI fills the record and shows how sure it is about each field. Fix what it flags.
-
03
Shelve
Confirm the machine, quantity and bin. Print a QR label if you want one.
-
04
Find
When it breaks, photograph it or type the number. Get the bin, take one, done.
Roadmap
Starts with parts. Grows into full maintenance management.
Machines, failures and stock movements are tracked from day one, so work orders and preventive maintenance can be added later without starting over.
-
Phase 1 · Now
Parts management
- Photo intake with AI identification
- Breakdown lookup by photo, number or text
- Locations, stock, suppliers, machines
- Receipts and documents vault
- QR labels and full audit trail
-
Phase 2 · Next
Smart operations
- Reorder automation and approvals
- Stock value, turnover and slow movers
- Email and text alerts
- Bulk import from spreadsheets
- Offline mode for dead zones
-
Phase 3 · Later
Full maintenance management
- Work orders with parts consumed automatically
- Preventive maintenance schedules
- Machine history and downtime cost
- ERP and accounting integrations
- MTBF, MTTR and executive reporting
See it with your own parts.
Bring a handful of spares and a receipt to the demo. We will show you intake and lookup on the spot.